Extract from company's reference list of customers:
Refining and Petrochemicals
BayernoilLocations Vohburg, Neustadt, Ingolstadt
Periodic cleaning of pipeline, containers, tanks, heat exchangers, composed of shutdowns.
SOW/Dow Chemical Böhlen Periodic cleaning of piping, tanks, tank, heat exchangers, execution of shutdowns.
Raffinerie LitvinovClean water and heat exchanger Ethylene Cracker
Elf Total LeunaDriving Sewage pipe cleaning and TV
Chemical Plants
Ashland Südchemie Kernfest Company is situated in Wülfrath and Hilden.
Periodic cleaning of pipes, tanks, tank and heat exchangers, composed of shutdowns.
BASF LudwigshafenTank cleaning for Rubber Production.
BASF SchwarzheidePipe cleaning and testing.
Bayer Leverkusen Cleaning in Tebanside, paining's removes from pipesystem, different heat exchangers.
Höchst AG Knapsack Plant shutdown MPP system, pressure test of the plant in Knapsack and Huerthpark, work with breath protecting system.
Radici ZeitzCooling system cleaning.
Hüls MarlHeart exchanger cleaning.
Degussa (AWD Arzeneimittelwerk Dresden)Wastewater system with Rotofan system, hard deposits from production.
Paper Industry
SappiPlant and Pipe cleaning.
WeigPipes and tanks cleaning.
Mondi Business Paper Syktyvkar (Russia)High pressure cleaning of pipelines of hardwood line in the pulp mill.
Stell industry
Thyssen Krupp Stahl AG Cleaning of gas washer instalation and the gas line to the scrubber, pipe cleaning during the regeneration.
Desposal site
Bayer Industrie Company is situated in Dormagen and Leverkusen.
Complicated pipe cleaning at the drainage system.
HöchstInfaServ landfill Knapsack
Complicated pipe cleaning at the drainage system.
Viersen II(Waste deposit)
Drain of 480m length.
Deponie Ville Hausmülldeponie AWG Köln mbHWorking under hard breathing conditions.
Deponie Denicil - Türkei 5,000 m drain pipe cleaning and TV inspection, more projects in progress.
Waste and Recycling industry
Verwertungszentren Inden TrienekensCleaning of containers in emergance situation in case start up.
Fa. WurmCleaning of drainage system in composting Hall in Cologne (AVG), and in Erftstadt (VZEK).
AWG WuppertalHigh pressure system testing and cleaning of landfill drainage pipes in the neutralization area.
Müllverbrennungsanlage in Kempten im AllgäuCleaning from grafit heart exhanger.
Müllverwertung KielCleaning from grafit heart exhanger.
Airports
Köln, Mönchengladbach, Leipzig/Halle, Dresden, Düsseldorf, Erfurt Pipe cleaning, high pressure testing and TV inspection; partial processing of the surfaces with high pressure water system.
Powerplants/Carbon
RWE- Kraftwerke Niederaußen und Neurath Pipe cleaning of ash lines, sewers, removal of sediment from the water.
Kraftwerk Leipzig AltwerkPurification of water and the steel pipe DN 900.
VEAG Kraftwerk ThierbachCooling tower cleaning, removing mud from 2000 m3 of cooling tower bottom.
VEAG Kraftwerk Lippendorf4000 m ash pipe cleaning, removal of hard deposits.
Kraftwerke in Serbien / JugoslawienCleaning of ash 11,000 lines.
Kraftwerk Regis-BreitingenMain heart exchanger system cleaning. Deposit 2000 kg.
VEAG Kraftwerke Schwarze Pumpe und Boxberg, sowie der Rhein/Main Kraftwerke Leak tests on cooling and pipe systems.
Gas and Powerplan
Kraftwerk Halle/TrothaPurification of feedwater;
Cleaning of gas turbine.
Nuclerpower industry
Kraftwerk PhillipsburgCleaning and TV inspection of the cooling water system.
RheinbraunPipe cleaning with a length of 380m of the pilot plant in Knapsack.
Building industry
For such companies as Amand, Arlt, Bilfinger + Berger, Heitkamp, Dyckerhoff, Dywidag, Heilit + Woerner, Strabag, Walter Bau, Züblin we provide complex of services for local german market as well as for their subsidarities abroad.
There is an example of one of the biggest project we accomplished.

In the Centro Oberhausen location our company cleaned and tested approximately 24,000 m channel of TV Inspections
for Cologne-Frankfurt ICE line Lot A and C. Additionally, we cleaned and checked approximately 60,000 meters
sewer and inspeacted TV (project still in progress) for future Oberhausen park. Then we cleaned and inspected 6,000 m, channel and traversed TV for several large projects with several 100 km channel; Then we cleaned channel and inspected the TV for City of Zurich. We cleaned about 2,000 meters of sewer and checked and inspected TV.